Generators G4 and G5 located in P2 had to removed and shipped to a Toronto based company to be dried out and tested. This will identify any damages from the March 29th lower Bonnechere landslide flooding we experienced.
Generator removal P2
April 19, 2016Written by Shawn Cameron